반복영역 건너뛰기
지역메뉴 바로가기
주메뉴 바로가기
본문 바로가기

연구정보

[지역개발] India - Jharkhand Power System Improvement Project : Environmental and Social Screening Report for Nagar Untari Grid Substation

인도 국외연구자료 연구보고서 - World Bank 발간일 : 2022-09-05 등록일 : 2022-09-07 원문링크

The objectives of the Jharkhand Power System Improvement Project for India are to increase the transmission capacity of electricity network in the state of Jharkhand and strengthen the institutional capacity of state-owned power transmission and distribution utilities. Some of the negative impacts and mitigation measures include: consultation with local community and stakeholder’s engagement; written consent from community or owner of the land required for stocking construction material temporarily; providing accommodation facilities to the migrant labors with proper ventilations; minimize labor influx as much as possible by engaging local labor; ensure separate labor camps for the labor, away from religious places and localities to the extent possible; grievance redressal system for the project to address such issues including sexual harassment at the workplace; displaying of various legal provisions on site, in labor camps and at prominent locations in the project area; and undertaking regular surveillance at site to check on Hygiene conditions for disease control and also to ensure that no discharges from the site are made to the adjoining sites.

본 페이지에 등재된 자료는 운영기관(KIEP)EMERiCs의 공식적인 입장을 대변하고 있지 않습니다.

목록