반복영역 건너뛰기
지역메뉴 바로가기
주메뉴 바로가기
본문 바로가기

연구정보

[환경] India - Second National Ganga River Basin Project : Environmental Assessment (Vol. 6) : Environmental Social Health and Safety Management Plan

인도 국외연구자료 연구보고서 - World Bank 발간일 : 2022-09-22 등록일 : 2022-09-25 원문링크

The development objective of the Second National Ganga River Basin Project for India is to reduce point source pollution in targeted urban areas and support the nodal ministry to develop an institutional framework for Ganga river basin management. Some of the negative impacts and mitigation measures include: (1) ensure that all necessary approvals for construction to be obtained by concessionaire are in place before start of construction activities; (2) identify the common utilities to be affected such as: telephone cables, electric cables, electric poles, water pipelines, public tabs, etc.; (3) to avoid local dispute, preference should be given to hire local labor as much as possible; (4) suitable drainage provision should be made to divert the rain water likely to be accumulated from peripheral catchment area of sewage treatment plant (STP), to natural drainage stream or area; (5) provision of effective separation and controlled disposal of digested sludge; (6) prioritize areas within or nearest possible vacant space in the project location; (7) excavated soil and construction debris shall be suitably stored to filling back the excavated areas after placing the sewer lines; (8) contractor will arrange for collection, storing, and disposal of oily wastes to the pre-identified disposal sites; (9) water shall be sprinkled regularly to suppress airborne dusts from truck and dumper movements particularly on unpaved surfaces; and (10) temporary diversion will be provided with the approval of the engineer. Detailed traffic control plans will be prepared and submitted to the engineers for approval, at least two weeks prior to commencement of works.

본 페이지에 등재된 자료는 운영기관(KIEP)EMERiCs의 공식적인 입장을 대변하고 있지 않습니다.

목록