반복영역 건너뛰기
지역메뉴 바로가기
주메뉴 바로가기
본문 바로가기

연구정보

[환경] India: Green Energy Corridor and Grid Strengthening Project

인도 국외연구자료 연구보고서 - Asian Development Bank 발간일 : 2023-12-08 등록일 : 2023-12-10 원문링크

The project comprised a loan to fund a portion of the interstate investments including two 765-kilovolt (kV) alternating current transmission lines and one 400-kV alternating current transmission line. It also included one 765/400 kV substation in Rajasthan state, upgraded to two existing 765/400 kV substations in Punjab and Rajasthan states, and equipment for measuring and monitoring real-time power flows, which was subsequently dropped. In addition, the project supported interregional transmission capacity augmentation between the southern and western region by financing HVDC transmission link comprising two 800-kV terminals: one in Chhattisgarh state (western region) and another one in Tamil Nadu state (southern region), along with two 320-kV HVDC terminals in the southern region connecting Pugalur in Tamil Nadu with North Trichur in Kerala.

본 페이지에 등재된 자료는 운영기관(KIEP)EMERiCs의 공식적인 입장을 대변하고 있지 않습니다.

목록